
USASERVICE OFFICEDometic, LLC2320 Industrial ParkwayElkhart, IN 46516574-294-2511CANADADometic, LLC46 Zatonski, Unit 3Brantford, OntarioCANADA N3T 5L8
10 a. EVENLY tighten the bolts to a torque of 40 to 50 inch pounds. This will compress the roof gasket to approximately 1/2". The bolts are self
11457915 & 459516 Unit Wiring DiagramWIRING DIAGRAM3313189.000 & 3313189.015 Single Zone LCD Control Kit Wiring Diagram Cool/Furnace%/.),(/&ap
2SAFETY INSTRUCTIONSThis manual has safety information and instruc-tions to help users eliminate or reduce the risk of accidents and injuries.RECOGNIZ
3Model No. NominalCapacity(BTU HR)CoolingElectricalRating120 VAC60Hz. 1PHCompressorRated LoadAmpsCompressorLocked RotorAmpsFan MotorRated Load AmpsFan
4INSTALLATION INSTRUCTIONSA. Precautions 1. Read Installation and Operating Instructions care-fully before attempting to start this unit installa-t
5There may be electrical wiring between the roof and the ceiling. Disconnect 120 VAC power cord and the positive (+) 12 VDC ter-minal at the supply b
6 • Duct size • Duct layout • Register size • Register location • Thermostat location • Indoor Temperature Sensor L
7F. Choosing Thermostat Location The proper location of the thermostat is very impor-tant to ensure that it will provide a comfortable RV temperatur
8H. Placing The Unit On The Roof 1. Remove the unit from the carton and discard carton. 2. Place the unit on the roof. 3. Lift and place the
9J. Wiring The System 1. 120 VAC Power Supply Connection a. Route the 120 VAC supply wire through the strain relief in the SZLCD control box. Tig
Kommentare zu diesen Handbüchern