22INSTALLATION & OPERATINGINSTRUCTIONSImportant: These Instructionsmust stay with unit.Owner read carefully.This manual must be read and understo
31AIR CONDITIONER WIRING DIAGRAMAIR BOX WIRING DIAGRAM3105595.015PASSEDDIELECTRICGR/YLFAN CAPFAN CAPBLU567GR/YLWHTWHT1234REDYELBLKIDBRNBRNREDRUN CAPR
23SAFETY INSTRUCTIONSThis manual has safety information and instruc-tions to help users eliminate or reduce the risk ofaccidents and injuries.RECOGNIZ
24** The Manufacturer gives GENERAL guidelines for gen-erator requirements. These guidelines come from experi-ences people have had in actual applica
25CAUTIONC. Roof Preparation1. Opening Requirements - Before preparing the ceil-ing opening, read all of the following instructionsbefore beginning th
26FIG. 6FIG. 7Do Not CutRoof StructureOr RaftersGood-RaftersSupported ByCross BeamsGood Location-Between RoofRaftersFrame Opening So ItWon't Coll
27FIG. 11Step aRemove AtPerforationStep bRemove AtPerforationStep cUse AsPackagedUpper DischargeAir DuctLower DischargeAir DuctRear Of AirConditionerU
281. You may either wire direct into the junction box fora permanent connection or wire a molded plug intothe junction box for a plug-in connection.a.
29B. Cooling Operation1. Set the thermostat at the desired temperature level.2. Select the fan speed that best satisfies your needs:a. HIGH COOL: Sel
30Roof Mount AssemblyRearAir ConditionerUpper DischargeDuctCeiling TemplateMounting BoltsAir BoxRoof OpeningFIG. 17
Kommentare zu diesen Handbüchern